How do I perform a dark voltage measurement on mOPM and how often should it be done?
Knowledge Base - FAQ
How do I perform a dark voltage measurement on mOPM and how often should it be done?
- Install metal cap (AC100) on OPM detector
- Open the MAP GUI
- Go to the mOPM detailed view
- Click the "Perform Dark" button
This should be performed every few months or when there is a significant change in environmental conditions (i.e. temperature changes by more than +/-3°C).