Avalanche: Which 1Gig ports must be connected for a back port test on SPT-C1?
Knowledge Base - FAQ
Avalanche: Which 1Gig ports must be connected for a back port test on SPT-C1?
• For running back to back test, you must connect port 1 to port 3 or port 2 to port 4.
• Note: the 1G ports on C1 are auto detect that can take crossover or straight through cables.