Knowledge Base - Solution

RFC Back to Back with pause frames

Monday, July 17, 2023
Submitted by ryan.grace on April 4, 2024 - 5:34pm
Problem: 
Why does the RFC 2544 Back to Back test fail to run when the other tests complete?
Solution: 
Back to Back testing requires bursting traffic at the line rate as opposed to shaping the traffic tranmission. If flow control is enabled, in the network, the testset can receive pause frames which can cause the test to abort. Some test equipment may have advanced settings to ignore pause frames but some may be unable to conduct the test unless the flow control is disabled on the network.

Product Family:

Support at Every Step

We provide support, services, comprehensive training and the resources you need. It’s all part of what we do to maximize the value of your VIAVI investment.

Value add services that compliment your VIAVI system solution and instrument portfolio to provide a total cost of ownership

Customer Service that provides Return Material Authorization (RMA) for repair and calibration

Technical education solutions, product training, and blended learning for technicians who are using new products or working with existing tools

Technical Assistance Center to assist you in using/configuring products or address issues regarding product performance