Avalanche, Why is the remaining time of a trial run test shown the same as the full test?
Knowledge Base - FAQ
Avalanche, Why is the remaining time of a trial run test shown the same as the full test?
When running a trial run test in Avalanche the remaining time displayed on the Run tab will not be different from a full test.
A trial run test consists of generating one sim user (per core) and executing the action list once. The remaining time displayed will be ignored and the trial run test will finish once the sim user goes through the entire action list.