VIAVI TestCenter: How to mount an SPT-N11U/SPT-N12U in a rack?

Knowledge Base - FAQ

VIAVI TestCenter: How to mount an SPT-N11U/SPT-N12U in a rack?
Two-Post Rack Mounting Warning: The chassis should never be installed in a two-post rack using the front rack ears. There is a risk of equipment damage and personal injury, due to the weight of the system. • Attach the center-mount brackets with the supplied screws if they are not already secured to the chassis. Be sure to use all screws. • Lift the chassis into the rack using an equipment lift or with four people to support and secure the chassis. • With the chassis being supported in the intended installation location, install four (4) rack mount screws through each rack ear and into the rack; totaling eight (8) rack mount screws Four-Post Rack Mounting • Remove the center-mount brackets with a screwdriver if they are secured to the chassis. • Install the ACC-2021A tray or a shelf with a depth of at least 30" and with a static loading capacity of at least 350 lb per chassis. • Lift the chassis onto the shelf using an equipment lift or with four people to support and secure the chassis.